Drawing review and DFM
Send 2D and 3D files; process, tolerance and tooling risks are reviewed before quotation.
Bathroom and furniture hardware: glass clamps, hooks, handles and brackets. Die-cast zinc and aluminium parts are machined, polished and chrome plated on our own lines. Sizes follow your drawing, and every batch passes an AQL 1.0 final check.
Aggregated from published models in this family. Values marked TBC are confirmed per drawing.
| Material | Aluminium alloy, Zinc alloy |
|---|---|
| Machining tolerance | ±0.5 mm, per drawing |
| Tube diameter | Ø6–80 |
| Wall thickness | TBC |
| Surface finish | Chrome plated |
| MOQ | Quoted per part |
| Lead time | Confirmed with the quote |
Furniture assembly, Bathroom fittings
The terms a purchasing team checks before releasing a drawing: MOQ, sampling, tooling, packing, inspection and quote response.
MOQ
TBC per part, material, finish and quantity; confirmed after drawing review.
Sample lead time
7 days after the drawing or sample is confirmed.
Tooling
DFM feedback in 3 working days; in-house tooling about 25 days.
Packing
Export cartons; quantity, labels and marks confirmed per order.
Inspection
Final AQL 1.0 sampling; inspection records travel with the shipment.
Quote response
Written quotation within 24 hours of a complete drawing and quantity.
Values are confirmed in the quotation once the drawing, material, finish and target quantity are known.
Drawing review, OEM/ODM, custom finish, private label, mixed containers and supplier audit support for repeat and project buyers.
Send 2D and 3D files; process, tolerance and tooling risks are reviewed before quotation.
Parts are produced to your drawing or developed from a sample, with first-article approval before batch runs.
Chrome plating, powder coating and painting are applied in house, with colour and gloss confirmed on samples.
Buyer-branded labels, cartons and instruction sheets are packed per order.
Several models and finishes can be combined in one container when volumes allow.
ISO 9001 certificate, inspection records and factory audit arrangements are provided during qualification.
In-house die casting
Cold-chamber and hot-chamber machines, in-house tooling, machining and finishing keep each process on one site.
Inspection to AQL 1.0
Incoming material, in-process dimensions and a final AQL 1.0 inspection are recorded; machined features are checked to ±0.5 mm.

B-501

B-502

B-503

B-504

B-505

B-506

B-507

B-508

B-509

B-510

B-511

B-512

B-513

B-514

B-515

M-301

M-302

M-303

M-304

M-305

M-306

M-307

M-308

M-309
Procurement facts
31 published models in this family. The answers below separate published specifications from values that are still TBC.
| Part use | Bathroom and cabinet hardware such as glass clamps, hooks, handles and shelf brackets. |
|---|---|
| Published fit | Glass or panel thickness is TBC per drawing; the published library does not state one common thickness. |
| Materials | Aluminium alloy, Zinc alloy |
| Finishes | Chrome plated |
| MOQ | TBC per part, material, finish and quantity |
| Sample lead time | 7 days after drawing and specification confirmation |
| Final inspection | AQL 1.0 sampling; records with shipment |
| Customization | Hole pattern, finish and logo reviewed from drawing |
| Mixed orders | Quoted per mix and packing requirement |
| Audit documents | ISO 9001, inspection records, drawing revision, packing list |
Bathroom and cabinet hardware such as glass clamps, hooks, handles and shelf brackets.
Glass or panel thickness is TBC per drawing; the published library does not state one common thickness.
Published material options: Aluminium alloy, Zinc alloy. Published finishes: Chrome plated.
Send a 2D PDF with tolerances and a 3D STEP, IGES or DWG file; a physical sample or clear photos can also start the review.
MOQ is TBC per part, material, finish and order quantity; samples take 7 days after the drawing and specification are confirmed.
Incoming material, in-process dimensions and a final AQL 1.0 sampling inspection are recorded before packing.
Yes, custom work is reviewed from the drawing: Glass thickness, hole spacing, finish and logo are confirmed from the drawing and sample.
Mixed models and project packages can be quoted; the mix, packing and minimum quantity are confirmed in the written quotation.
The audit pack can include the ISO 9001 certificate, AQL 1.0 inspection records, drawing revision, packing list and material or finish records where agreed.
Send the drawing, target quantity and finish through the request-quote page; a written quotation is returned within 24 hours when the drawing and quantity are complete.
Casting, machining, polishing, plating and inspection run at one site in Tongshan, Hubei.
Inspection is recorded from incoming material to the final AQL 1.0 sample before packing.
The review starts with a 2D drawing and a 3D file, then moves to DFM, quotation, sample and first batch.
Published materials: Aluminium alloy, Zinc alloy. Published finishes: Chrome plated.
Check the interface and the service condition before comparing models or prices.
A complete checklist shortens the drawing review and avoids a quotation based on assumptions.
31 published models, from B-501 to M-316. Each model links to its own specification table.
A drawing, a sample or a target price is enough to start. Tooling in 25 days, samples in 7 days.