Display Rack Shelf Connector X-207 for Retail Shelving, Display and Transit Hardware, Ø25 mm Tube, Zinc Alloy

X-207 display rack hardware for retail shelving and transit interiors.

Procurement actions for

X-207

Choose an action; the engineering form opens with the matching request type.

One-Line Buyer Summary

Display Rack Shelf Connector X-207 is a die-cast fitting for Display stands, retail racks, shelves and transit hardware applications. It fits Ø25 mm round tube. Net weight 45 g. Material Zinc alloy. Finish Chrome plated. Packing 200 pcs/ctn, carton 42 × 25 × 17 cm.

Display Rack Shelf Connector X-207, Ø25 mm tube, Zinc alloy, Chrome plated for Display stands, retail racks, shelves and transit hardware applications

Datasheet issued with the quotation

Display Rack Shelf Connector X-207: Quick Specifications

Model
X-207
Material
Zinc alloy
Tube Diameter
Ø25 mm
Wall Thickness
TBC
Dimensions
Ø54.5 × H40 mm
Weight
45 g
Finish
Chrome plated
Clamping Depth
TBC
Fixing Method
TBC
Machining Tolerance
±0.5 mm, per drawing
Inspection
AQL 1.0 final inspection, records with shipment
Packing
200 pcs/ctn, carton 42 × 25 × 17 cm
MOQ
TBC
Sample Lead Time
7 days
Mass Production Lead Time
TBC

Compatibility and Fixing for X-207

Tube diameter

Ø25 mm

Tube wall thickness

TBC

Clamping depth

TBC; confirmed on the drawing for this model.

Fixing method

TBC; the fixing method is confirmed on the drawing and sample.

Finish

Chrome plated

Packing

200 pcs/ctn, carton 42 × 25 × 17 cm

Inspection

AQL 1.0 final inspection, records shipped with the order

Machining tolerance

±0.5 mm, per drawing

Adjacent models

Ø25 mm models in this family: X-201, X-201A, X-205, X-206. Fit is not implied; confirm the drawing and clamping depth before substituting.

Applications Supported by the X-Series

The published family supports these applications. The final use of X-207 is confirmed from the tube diameter, fixing method and drawing.

Retail Display

Display stands, retail racks, exhibition frames and modular display structures.

Shelving

Shelf frames, shelf beams and adjustable shelving built from round tube.

Shopfitting

Shopfitting frames, counter structures and fixture connections for retail projects.

Transit Interior

Interior brackets and fittings for bus, coach and rail interior structures.

Manufacturing and Finishing

  1. 01

    Die casting

    The body is die-cast in our own plant, in zinc alloy (Zamak) or the material confirmed on the drawing.

  2. 02

    Machining

    Bores, fixing holes and faces are machined to the dimensions on the confirmed drawing.

  3. 03

    Polishing

    Visible faces are polished before plating so the retail and transit surfaces stay clean.

  4. 04

    Plating

    Chrome plating is standard; nickel plating, powder coating or polishing are applied as specified.

  5. 05

    Inspection

    Dimensions are checked to the drawing and a final AQL 1.0 inspection is recorded before packing.

Quality Control for X-207

  • Machining tolerance: ±0.5 mm, per drawing, as stated on the current product page.
  • Final AQL 1.0 sampling inspection before packing, with records shipped with the order.
  • Dimensions checked against the confirmed drawing for this model.
  • Batch traceability: TBC; the record format required by the project is confirmed with the order.

OEM/ODM Options for X-207

Drawing review
2D PDF, STEP or DWG review with DFM feedback in 3 working days.
Material substitution
Zinc alloy, aluminium alloy or steel quoted from the drawing; confirmed on the sample.
Custom finish
Chrome, nickel, powder coating or polishing specified for the project.
Logo
Laser or private-label marking discussed at drawing review and confirmed on the sample.
Packaging
Carton quantity, labels and shipping marks set per order; mixed containers subject to order quantity.

Support for Large Buyers

Drawing review, OEM/ODM, custom finish, private label, mixed containers and supplier audit support for retail, shopfitting and transit projects.

Drawing review and DFM

Send 2D and 3D files; process, tolerance and tooling risks are reviewed before quotation.

OEM and ODM programmes

Parts are produced to your drawing or developed from a sample, with first-article approval before batch runs.

Custom finish

Chrome plating, powder coating and painting are applied in house, with colour and gloss confirmed on samples.

Private label

Buyer-branded labels, cartons and instruction sheets are packed per order.

Mixed container loading

Several models and finishes can be combined in one container when volumes allow.

Supplier audit support

ISO 9001 certificate, inspection records and factory audit arrangements are provided during qualification.

Procurement facts

Factual procurement answers: X-207

Answers for X-207 use the published specification for this model. Values not present in that specification are marked TBC.

Procurement facts at a glance
ModelX-207
Part useDisplay stands, retail racks, shelves and transit hardware applications
Published fitThis model fits Ø25 mm tube.
MaterialZinc alloy
FinishChrome plating
MOQTBC per part, material, finish and quantity
Sample lead time7 days after drawing and specification confirmation
Final inspectionAQL 1.0 sampling; records with shipment
CustomizationHole pattern, finish and logo reviewed from drawing
Audit documentsISO 9001, inspection records, drawing revision, packing list

The 10 procurement questions

1. What is this part used for?

Display stands, retail racks, shelves and transit hardware applications.

  • Reference: X-207.
  • Application fit is confirmed against the drawing; the part is not selected by model number alone.

2. Which tube diameter or panel thickness does it fit?

This model fits Ø25 mm tube.

  • Tube diameter, wall thickness, panel thickness and clamp depth are checked separately; one value does not confirm the others.
  • Values not stated in the published specification are marked TBC and confirmed before quotation.

3. Which material and finish are available?

Published material options: Zinc alloy. Published finishes: Chrome plating.

  • The exact alloy and finish are confirmed on the drawing and approved sample.
  • Material or finish changes are quoted only after the tooling and process are reviewed.

4. What drawing or sample information is needed?

Send a 2D PDF with tolerances and a 3D STEP, IGES or DWG file; a physical sample or clear photos can also start the review.

  • Include tube diameter or panel thickness, material, finish, target quantity, packing and label requirements.
  • DFM feedback is returned in 3 working days; the written quote follows within 24 hours of a complete drawing and quantity.

5. What is the MOQ and sample lead time?

MOQ is TBC per part, material, finish and order quantity; samples take 7 days after the drawing and specification are confirmed.

  • No general MOQ is published for this family because size, tooling and finish change the production lot.
  • Tooling, when required, takes about 25 days; existing tooling can shorten the sample plan.

6. How is the part inspected before shipment?

Incoming material, in-process dimensions and a final AQL 1.0 sampling inspection are recorded before packing.

  • Machined features are checked to ±0.5 mm, per drawing.
  • Inspection records travel with the shipment; batch traceability is TBC and confirmed with the order.

7. Can the supplier make a custom hole pattern, finish or logo?

Yes, custom work is reviewed from the drawing: Pole clamps, shelf brackets, hole patterns and private-label marking are reviewed from the drawing.

  • Hole pattern, finish and logo changes are checked against the tooling before quotation.
  • The approved sample is the reference for the first production batch; tooling impact is TBC per change.

8. Can the buyer order mixed models or a project package?

Mixed models and project packages can be quoted; the mix, packing and minimum quantity are confirmed in the written quotation.

  • Each model keeps its own drawing and specification; a neighbouring model is not substituted without written confirmation.
  • Carton labels, mixed-carton requirements and project packing are set per order; container and logistics terms are not published as fixed facts.

9. What documents can be supplied for a supplier audit?

The audit pack can include the ISO 9001 certificate, AQL 1.0 inspection records, drawing revision, packing list and material or finish records where agreed.

  • ISO 9001 has been held since 2021; the certificate number is TBC in the current product data.
  • Batch traceability format and any project-specific inspection report are TBC and confirmed with the order.

10. How can the buyer request a quote?

Send the drawing, target quantity and finish through the request-quote page; a written quotation is returned within 24 hours when the drawing and quantity are complete.

  • The quote states material, finish, MOQ, sample plan, tooling scope and packing assumptions.
  • Email and WhatsApp are available for drawing files that need a short technical clarification.

Citable procurement modules

Manufacturing capability

Casting, machining, polishing, plating and inspection run at one site in Tongshan, Hubei.

  • 9,000 m² site with a 6,000 m² workshop; 60+ employees and 6 mould engineers.
  • 8 cold-chamber and 4 hot-chamber die-casting machines; in-house tooling, machining and finishing.
  • ISO 9001 since 2021; DFM feedback in 3 working days and tooling in about 25 days.

Quality and inspection records

Inspection is recorded from incoming material to the final AQL 1.0 sample before packing.

  • Machined features are checked to ±0.5 mm, per drawing.
  • Final AQL 1.0 sampling records travel with the shipment.
  • Batch traceability format is TBC; the ISO 9001 certificate number is TBC in the current data.

Drawing review and OEM process

The review starts with a 2D drawing and a 3D file, then moves to DFM, quotation, sample and first batch.

  • 2D PDF with tolerances plus STEP, IGES or DWG; photos or a sample can start the review.
  • DFM feedback in 3 working days; written quote within 24 hours of a complete drawing and quantity.
  • Tooling about 25 days; samples 7 days after drawing and specification approval.

Material and finish selection

Published materials: Zinc alloy. Published finishes: Chrome plating.

  • Choose the alloy from the load, wall section and fixing method, not from colour alone.
  • Finish is confirmed on an approved sample; colour and gloss are not guaranteed from a screen image.
  • Material or finish substitution is quoted only after tooling and process review.

Application-specific buying guide

Check the interface and the service condition before comparing models or prices.

  • Retail shelving and shopfitting frames
  • Display stands and exhibition structures
  • Bus, coach and rail interior brackets

Buyer checklist before requesting a quote

A complete checklist shortens the drawing review and avoids a quotation based on assumptions.

  • 2D drawing with tolerances and a 3D STEP, IGES or DWG file.
  • Tube diameter, wall thickness, panel thickness or mounting hole pattern.
  • Material, finish, colour and approved-sample requirement.
  • Target quantity, annual volume and mixed-model or project scope.
  • Packing, carton label, shipping mark and private-label requirement.
  • Inspection report, certificate or supplier-audit documents required.
  • Sample deadline and first-batch delivery target.
  • Quote contact, destination country and required Incoterm, if already fixed.

For L2/L3 buyers and project procurement

Engineering procurement desk

Send the drawing, target quantity and market. The model, fit and commercial terms are checked against your drawing, not against a neighbouring part.

Request type

Drawing or sample upload (optional)

PDF, DWG, STEP, DXF, JPG or PNG, up to 20 MB per file.

* Required field

Your details are used only to answer this procurement request.

鄂ICP备2026043223号-1