Export Packing for Small Die-Cast Parts
QUICK ANSWER
Small cast parts are usually damaged in transit rather than in use, so packing is part of the specification. Agree inner bags, carton grade, pallet marks and the container plan before dispatch; we build the carton once instead of repacking at the port.
Damage happens between the lines
A finished connector that leaves the line in good condition can still arrive with rubbed plating and bent screws. Loose parts in a large carton move against each other for weeks.
Inner packing and carton size control this. Both are cheap to set at the start and expensive to fix after a claim.
Inner bags and carton grade
Parts are bagged per set or per quantity you fix, then packed so the carton is full rather than half empty. Void fill is added where the shape leaves gaps.
State the carton grade or the stacking requirement if your warehouse stacks high. A weaker carton shows at the bottom of the pallet, not at the top.
Pallet marks and container plan
Pallet marks follow your receiving rules: item code, quantity, batch and handling symbols. The container plan shows how pallets or cartons are placed to avoid movement.
If several items ship together, tell us the unloading order. Loading in the wrong sequence means the last item is the first one needed.
Agree the packing spec early
Packing appears in the quotation as a line item, so changes after the order affect cost and timing. Any special requirement is best raised at enquiry stage.
Outgoing lots are inspected at AQL 1.0 before packing, so a packing issue is not mistaken for a production defect later.
Questions from Buyers
Bagged per set, packed into a full carton and palletised. The exact counts and labels are confirmed per order.
Send Your Drawing, Get a Written Quote in 24 Hours
A drawing, a sample or a target price is enough to start. Tooling in 25 days, samples in 7 days.
