Custom R&D & Mould Development

Drawing review, DFM feedback and in-house tooling for custom metal parts. Six tooling engineers build moulds in about 25 days, with samples in seven days for your approval before mass production.

What This Service Covers

  • Drawing and 3D review

    Drawings and STEP files are checked for wall thickness, draft angle and tolerance before the quotation is issued.

  • DFM feedback in three days

    Material, parting line, ejection and finish options are reported within three working days of receiving the drawing.

  • Mould design and build

    Six tooling engineers design and build moulds on site, with new tooling ready in about 25 days.

  • Sampling and sign-off

    Samples are produced about seven days after the mould is approved, then sent to you for sign-off.

  • Tooling upkeep

    Moulds are maintained on a fixed schedule, so repeat batches follow the approved sample.

How the Work Runs

  1. 01

    Requirement review

    Send a drawing or sample. Material, tolerance, finish and target quantity are confirmed with you.

  2. 02

    DFM report and quotation

    Feedback comes back in three working days, with mould cost, unit price and lead times in writing.

  3. 03

    Tooling and first sample

    Tooling is built in house in about 25 days, then a first sample is produced for your check.

  4. 04

    Approval and production

    Mass production is released only after your approval, with first-article records kept on file.

Service Questions

New tooling takes about 25 days after the drawing is approved.

Send Your Drawing, Get a Written Quote in 24 Hours

A drawing, a sample or a target price is enough to start. Tooling in 25 days, samples in 7 days.

Email your drawing
鄂ICP备2026043223号-1