Custom R&D & Mould Development
Drawing review, DFM feedback and in-house tooling for custom metal parts. Six tooling engineers build moulds in about 25 days, with samples in seven days for your approval before mass production.
What This Service Covers
Drawing and 3D review
Drawings and STEP files are checked for wall thickness, draft angle and tolerance before the quotation is issued.
DFM feedback in three days
Material, parting line, ejection and finish options are reported within three working days of receiving the drawing.
Mould design and build
Six tooling engineers design and build moulds on site, with new tooling ready in about 25 days.
Sampling and sign-off
Samples are produced about seven days after the mould is approved, then sent to you for sign-off.
Tooling upkeep
Moulds are maintained on a fixed schedule, so repeat batches follow the approved sample.
How the Work Runs
- 01
Requirement review
Send a drawing or sample. Material, tolerance, finish and target quantity are confirmed with you.
- 02
DFM report and quotation
Feedback comes back in three working days, with mould cost, unit price and lead times in writing.
- 03
Tooling and first sample
Tooling is built in house in about 25 days, then a first sample is produced for your check.
- 04
Approval and production
Mass production is released only after your approval, with first-article records kept on file.
Service Questions
New tooling takes about 25 days after the drawing is approved.
Send Your Drawing, Get a Written Quote in 24 Hours
A drawing, a sample or a target price is enough to start. Tooling in 25 days, samples in 7 days.
