Full-Process QC Inspection

Material, dimensions, appearance, coating and loading are checked from incoming goods to the last carton. Batch records are kept on file, and outgoing inspection follows AQL 1.0 unless your order sets another level.

What This Service Covers

  • Incoming material checks

    Steel tube, zinc alloy and coating materials are checked against the order before release to production.

  • In-process inspection

    Dimensions are checked during the batch, so drift is corrected before parts reach finishing.

  • CMM dimensional measuring

    Critical dimensions are verified on a coordinate measuring machine against the drawing or approved sample.

  • Appearance inspection

    Finished parts are inspected under strong light for burrs, scratches and plating defects.

  • Performance testing

    Salt spray to ISO 9227, static load and fatigue tests, and coating adhesion checks run in house.

  • Outgoing inspection

    Outgoing inspection follows AQL 1.0, and the records travel with the batch file.

How the Work Runs

  1. 01

    Incoming inspection

    Material certificates and dimensions are checked before goods enter the workshop.

  2. 02

    In-process checks

    First article, patrol checks and dimension sampling run alongside production.

  3. 03

    Final inspection

    Appearance, dimensions, finish and packing are checked on the outgoing AQL sample.

  4. 04

    Records and release

    Inspection records are filed per batch, then the shipment is released for packing.

Service Questions

Dimensions, appearance, plating or coating, and packing, on an outgoing AQL 1.0 sample.

Send Your Drawing, Get a Written Quote in 24 Hours

A drawing, a sample or a target price is enough to start. Tooling in 25 days, samples in 7 days.

Email your drawing
鄂ICP备2026043223号-1