Choosing Connectors for Display and Rack Frames

Author: Technical TeamReviewed by: Tooling EngineerPublished: 22 October 2026Updated: 31 October 20266 min read

QUICK ANSWER

Draw the frame grid first, then choose connectors that carry the load in the direction it arrives. Fixed joints hold frames square, adjustable joints absorb site error. Confirm tube wall and clamping depth on the drawing; we hold machined features to ±0.5 mm and inspect at AQL 1.0.

Define the frame grid before the parts

A display frame is a grid of tubes: uprights, shelves and ties. The connectors only work if the grid, the tube diameter and the joint positions are fixed on one drawing.

Mark each joint as fixed, adjustable or corner. A frame built from mixed joints needs a different assembly order, so agree that order early.

Fixed joints keep retail frames square

In shops, a frame that is slightly out of square shows in the shelf line. A fixed 90° joint removes the adjustment step and keeps the display aligned after repeated assembly.

Where the floor or the wall is uneven, use an adjustable joint at the base only. That keeps the visible frame rigid while absorbing the building error.

Tube wall and clamping depth stay on the drawing

The connector grips the tube wall, so wall thickness and the tube surface matter more than the nominal diameter. Powder-coated tubes seat differently from bare tubes.

Send the tube specification with the frame drawing. Clamping depth, screw position and relief are confirmed there, and anything still open is marked TBC.

Inspect and pack for retail delivery

Display hardware is visible, so appearance counts as much as fit. We check appearance, dimensions and finish, and outgoing lots follow AQL 1.0.

Cartons can be labelled per store or per bay, and a container loading plan is agreed before dispatch. Tell us the receiving rules at quotation stage.

Questions from Buyers

It follows from the bay size and the load on each shelf, so we confirm it with your frame drawing. Our catalogue covers several diameters across the connector range.

Send Your Drawing, Get a Written Quote in 24 Hours

A drawing, a sample or a target price is enough to start. Tooling in 25 days, samples in 7 days.

Email your drawing
鄂ICP备2026043223号-1