First Article Approval Before Serial Production

Author: Technical TeamReviewed by: Tooling EngineerPublished: 28 October 2026Updated: 31 October 20265 min read

QUICK ANSWER

A first article is one part from the new tooling, checked in full against the drawing before the mould runs a serial lot. It covers dimensions, appearance, thread and finish. Once signed off, that piece becomes the reference and later runs are compared with it.

Why the first piece decides the run

A mould that is right on the first shot stays right for the run. A mould that is accepted with a small problem passes that problem on to every piece made.

That is why the check happens before serial running, not after. Fixing a setting early costs less than sorting a finished lot.

What the check covers

Dimensions are measured against the drawing, including the ±0.5 mm limits on machined features. Appearance, thread and finish are then compared with the approved sample.

If the part has a mating component, a trial assembly is included. Any deviation is listed before the lot starts, not discovered at packing.

Sign-off and changes

Approval can be given on the drawing, on a photo sheet or on the physical part. Whichever form you use, it should name the piece and the date.

Any change after sign-off, including a material or finish swap, restarts the check. A new reference is approved rather than reused silently.

Keeping the reference for later runs

One approved piece is kept with the drawing and the finish sample. Repeat orders are compared with it at the start of the run.

Outgoing lots still follow AQL 1.0, and the factory has held ISO 9001 certification since 2021.

Questions from Buyers

It follows the tooling: drawing review takes three days, new tooling about 25 days, and samples seven days after approval.